1 scope PDF
Native text only
Compare each proposal against one citation-backed requirement set. Select a finding in the matrix to inspect its status, confidence, quoted evidence, and cited proposal page.
Obtain and pay for electrical permits and inspection fees.
Furnish and install scheduled light fixtures.
Provide complete testing and commissioning of electrical systems.
Incorporate Addenda 1 through 4 into bid pricing.
Pacific Power, Light fixtures: Alternate. +$214k alternate. Proposal evidence on page 2.
+$214k alternate · +$214,000
“Light fixtures are available as Alternate No. 1: add $214,000.”
Current intake is one native-text scope PDF and two to eight bidder proposals. Files must be English native text and no larger than 25 MB each. Bid OCR is not part of this workflow.
Native text only
Separately identified bidders
Maximum per PDF
Native-text documents
Each stage produces the structured input for the next, with reconciliation between model output and the complete comparison grid.
Validate the scope, bidders, and file boundaries.
Create atomic requirements with source quotes and pages.
Read each proposal separately against the same requirement set.
Confirm complete requirement-by-bidder coverage before review.
The interactive matrix above carries all six states. Search, filters, base bids, confidence, and review markers stay in the same working view.
Silent means no meaningful reference was located. It is never presented as an exclusion.
Find requirements by code, category, or language.
Narrow by finding state or review requirement.
Keep each proposal amount visible beside scope findings.
Surface low-confidence or unresolved findings for human review.
A scope quote establishes the requirement. The proposal quote and cited page show the bidder response. The effective finding records how that evidence appears in the comparison.
Furnish and install scheduled light fixtures.
“Light fixtures are available as Alternate No. 1: add $214,000.”
Required fixture scope is outside the $918,750 base bid.
Proposal cites Addenda 1 through 3; scope requires Addenda 1 through 4.
Required fixtures appear only as a priced alternate.
Confirm that pricing incorporates Addendum 4 and identify any price change.
Confirm whether required fixtures are included in the base bid.
Correction history preserves the model result, the reviewer change, and the reason. The estimator remains responsible for the effective finding.
Unclear · 54% confidence
Qualified · testing excluded
Reviewer, time, and reason recorded
The deliverable is a source-linked Excel workbook, produced after reconciliation and approval. Mobus structures the evidence; the estimator retains the award decision.
Matrix findings, cited evidence, risks, and clarifications remain reviewable after export.
The product story is grounded in access, provenance, human review, and quality control. It makes no unsupported certification, retention, or compliance claims.
We will use a fictional electrical trade package to walk through the matrix, source evidence, review controls, and Excel delivery.
Request a demoNo customer documents required