One brain for every stage of preconstruction.
Mobus Brain supports preconstruction from site research to field handoff. Each stage draws on everything your company already knows, and every result stays tied to its source, so your team can check it before acting.
Eight stages. One evidence trail.
Each stage hands its work to the next. Mobus keeps what the team relies on at every step connected to the document that supports it.
- 01 · Site research
Know the site before you price it.
Where it slows down: Deeds, recorded maps, prior surveys, and agency records live in different systems and file formats.
Where Mobus helpsSite Research
Bring deeds, recorded maps, prior surveys, and parcel, flood, zoning, and permit records into one workspace, and trace every answer to its source.
- You get
- Site evidence in one place, traced to its records
- Draws on
- Deeds and recorded maps · Prior surveys · Parcel, flood, and zoning data
- 02 · Document review
Get to know the drawings and specifications.
Where it slows down: The sheet you need is in the set, but reaching it means knowing its number or the folder it was filed in.
Where Mobus helpsDocument Retrieval
Ask for any sheet or file in plain language, review the ranked match, and open the cited page.
- You get
- The ranked source, opened at the cited page
- Draws on
- Drawing sets · Project files
- 03 · Takeoff
Measure every quantity in the drawings.
Where it slows down: Counts, lengths, and areas are measured by hand, sheet by sheet, before pricing can start.
Where Mobus helpsTakeoff
Mobus measures counts, lengths, and areas from the drawings automatically, and links each quantity to where it was measured.
- You get
- Quantities linked to the sheet they came from
- Draws on
- Drawings
- 04 · Estimating
Price the work, from the first budget to the full estimate.
Where it slows down: The unit costs your company learned on past jobs sit in old spreadsheets, so each estimate starts over.
Where Mobus helpsEstimating
Price the takeoff with unit costs from your own past projects, or build an early budget before the drawings are complete, then export to Excel or your estimating software.
- You get
- Early budgets and priced estimates, ready to export
- Draws on
- Takeoff quantities · Past projects and costs
- 05 · Scheduling
Plan the work and keep every deadline in view.
Where it slows down: Schedules start from a blank template, and bid, submittal, and procurement dates live in inboxes.
Where Mobus helpsScheduling
Draft the schedule from the documents and scope, with durations from how long similar work took on past jobs, and track bid dates, submittal deadlines, and long-lead procurement.
- You get
- A draft schedule, ready for P6 or Microsoft Project
- Draws on
- Project documents and scope · Past project durations
- 06 · Bid leveling
Compare proposals and close the gaps before award.
Where it slows down: Exclusions, alternates, and silence surface in different places in each proposal, often after the deadline.
Where Mobus helpsBid Leveling
Turn the scope into cited requirements, read every proposal against them, then review risks and clarification drafts before export.
- You get
- A cited comparison matrix and Excel workbook
- Draws on
- Scope document · Bidder proposals
- 07 · Buyout & submittals
Buy out the work and set up the submittal register.
Where it slows down: Submittal requirements are spread across every specification section, so the register is rebuilt by hand.
Where Mobus helpsSubmittal Review
Build a cited submittal register from the specifications, then review each package against its requirements.
- You get
- A cited register and requirement-level review
- Draws on
- Specifications · RFIs · Submittal packages
- 08 · Field handoff
Get the current documents to the people building.
Where it slows down: Crews ask for a drawing by what it shows, while the files are named by sheet number and revision.
Where Mobus helpsDocument Retrieval
Let crews ask for a drawing by what it shows, then open the cited source page.
- You get
- The right sheet, opened at the cited page
- Draws on
- Approved drawing set
Every project document
Drawings, specs, proposals, submittals, RFIs, and addenda, across every project rather than one at a time.
Past projects and costs
Historical bids, actual costs, and subcontractor history from the jobs your company has already built.
Connected systems
Data from the tools your team already uses, such as Procore, your ERP, accounting, and email.
Team know-how
Company standards, emails, meeting notes, and lessons learned.
One standard at every stage.
- 01
Start with the source
Drawings, specifications, proposals, submittals, past projects, and project files remain the basis of every answer.
- 02
Make the result visible
Each workflow shows the quantity, comparison, finding, or match itself instead of hiding it behind a summary.
- 03
Open the evidence
Where a result comes from a document, a person can open the supporting quote, file, or cited page before acting.
- 04
Keep people in control
Review states, corrections, and quality checks preserve the human decision.
Mobus prepares. Your team decides.
Clear limits help your team see where Mobus fits and what stays with the people accountable for the work.
- The decision stays with your team
- Mobus prepares the quantities, estimates, schedules, and findings. Your team checks the source and makes the call.
- Current file limits
- Each workflow lists its intake limits on its own page. Bid Leveling and Submittal Review, for example, read native-text English PDFs today.
Bring one preconstruction problem to its source.
Use a fictional drawing set, trade package, or submittal packet. We will show the full source path in the demo, from takeoff to the field.