Mobus platform

    Two workflows. One source-grounded evidence standard.

    Mobus helps construction teams compare subcontractor bids and retrieve project documents while keeping each useful result connected to evidence a person can inspect.

    Follow the finding back to its source.

    The same review discipline applies whether the team is reconciling proposal scope or searching a drawing set.

    1. 01

      Start with the source

      Scopes, proposals, project files, and drawing pages remain the basis of the answer.

    2. 02

      Make the finding visible

      The workflow exposes the status or ranked match instead of hiding the result behind a summary.

    3. 03

      Open the evidence

      A reviewer can inspect the supporting quote, original file, and cited page before acting.

    4. 04

      Keep people in control

      Review states, corrections, and quality checks preserve the human decision.

    Provenance spine

    One finding. Every step back to source.

    01 · Scope source

    REQ-002 · Light fixtures

    Furnish and install scheduled light fixtures.

    Sunset_Hotel_Electrical_Scope.pdf · page 1
    02 · Bid evidence

    Pacific Power proposal

    “Light fixtures are available as Alternate No. 1: add $214,000.”

    Pacific_Power_Systems_Bid.pdf · page 2
    03 · Effective finding

    Priced alternate

    Required fixture scope is outside the $918,750 base bid.

    99% confidence · review required
    Original AI value retained after any manual correction
    Clarification question generated from the same finding

    Bid Leveling

    Compare each proposal independently against extracted scope, then reconcile evidence, risk, and review state in one matrix.

    Explore Bid Leveling
    MobusBid leveling
    Analysis complete
    Sunset Hotel Renovation / 26-00-00
    Electrical bid package
    Scope requirement
    A
    Summit Electric$942,500
    B
    Pacific Power$918,750
    C
    VoltWorks$971,200
    REQ-001 · General conditionsPermits & inspection fees
    REQ-002 · Fixtures & equipmentLight fixtures
    REQ-003 · TestingTesting & commissioning

    Pacific Power, Light fixtures: Alternate. +$214k alternate. Proposal evidence on page 2.

    Fictional demo: 36 of 36 comparisons persistedPacific Power · Alternate
    Mobus Document RetrievalIndexed project documents
    Index ready
    Ask for a file, sheet, or page
    show me the second-floor fire alarm planSearch

    Best match: FA102, SECOND FLOOR FIRE ALARM PLAN, document page 205.

    Ranked match · cited sheet1 result
    Fire alarm · sheet FA102

    SECOND FLOOR FIRE ALARM PLAN

    Matched from page text and decoded title-block metadata.

    Original locationDocument page 205
    Standalone filepage_205.pdf
    FA102 · SECOND FLOOR FIRE ALARM PLAN
    3143 Drawings DAFS_0.pdfOpen exact page

    The response returns both the original document path and the standalone page file, so the pointer remains useful and auditable.

    Document Retrieval

    Ask for a project file or sheet in plain language, inspect the ranked match, and open the original source at the cited page.

    Explore Document Retrieval
    Human review stays in the workflow

    Bring one real question to the source.

    Request demo